Update for MWRA Southern Extra High Pipeline Project,
Dedham North (MWRA Contract 7504)

overview of work area

Overview of work to be performed in Dedham under MWRA Contract 7504

About this Project:

This project will provide water service redundancy for Boston, Canton, Norwood, Stoughton, and Dedham‐Westwood, through construction of a redundant pipeline. The project will also increase distribution storage within the service area to improve system operation and reliability. Work will include the construction of a pipeline from the Bellevue storage tank to East Street in Westwood.

Contract 2 of the Southern Extra High pipeline project has started. The contractor, P. Gioioso and Sons, has completed their first phases of work which involved the protection and wrapping of trees along the pipeline alignment.  Other trees have been marked and removed along Dedham Blvd and further along the alignment. The first phase of pipe work involves the installation of a new drainage line along with the primary focus of installing the new 36” water line.  This work began in the area of Emmett Avenue to just beyond Charity Lane.  Once the drain line has been installed the contractor will go back and begin to install the new 36” water line within Dedham Blvd. from the Boston line and head in the direction of Emmett Avenue.  This work will be continuous with traffic detours in place on a daily basis. Traffic detours are described below.

traffic

Traffic Impacts:

Dedham Blvd will be closed in both directions from Sawmill Lane to Alwin St. except for abutters.  Southbound will be detoured at Alwin St to Turtle Pond Parkway onto River St.  Northbound will be detoured onto Milton St. to River St and Turtle Pond Parkway.

Walnut Street will be closed in both directions from Whiting Avenue to Milton Street.  The detour will utilize Whiting Avenue, River Street and Milton Street.


The contractor plans on utilizing a second crew and they will begin on Walnut Street at Oakdale Avenue heading South towards Mt. Vernon Street.  This crew plans to begin the 36 inch water pipeline installation work on Monday, March 5, 2018.  Residents in this area will begin to see preliminary work involving surveys, test borings and pits, tree protection, and the installation of the 36” pipe.   All roads where the new pipe is installed will be paved from curb to curb at the end of this contract.  This contract (two) is scheduled to be complete by the end of 2019.

MWRA has developed a notification system for communicating information to residents regarding construction projects, community meetings and more.  Once you sign up you will receive periodic updates on the progress of the construction project, as well as traffic detour updates.  We encourage all residents to sign up at http://www.mwra.com/updates/everbridge/join.html.  This construction project is named the Southern Extra High Pipeline - Section 111 (Dedham North), Contract 7504.  

This contract (“Contract 2”) is scheduled to be complete by the end of 2019.

For more information, please call Jeff McLaughlin at MWRA at (617)305-5762 or by email at Jeffrey.McLaughlin@mwra.com.

Project Updates

April 11, 2018

Construction Photos

Construction photo April 11 2018
Construction photo April 11 2018

Installation of 24-inch drain on Dedham Boulevard

Construction photo April 11 2018

Ledge removal on Dedham Boulevard

Construction photo April 11 2018
Construction photo April 11 2018

Pipe installation on Walnut Street

Construction photo April 11 2018
Construction photo April 11 2018

Air valve manhole on Walnut Street

 

March 6, 2018

Construction Update

Second work crew on Walnut Street started on Monday, March 5.

Upcoming work:

Installing drain on Dedham Boulevard

Sign up for electronic project notifications and updates through our Everbridge service.

photo 1 030618

24-inch RCP drain installation on Dedham Boulevard

photo 2 030618

Setting drain manholes on Dedham Boulevard

photo 3 030618

Ledge removal on Dedham Boulevard

photo 4 030618

Ledge removal on Dedham Boulevard

photo 5 030618

Pipeline laid out on Mount Vernon

February 13, 2018

Construction Update

The contractor has started the installation of the DCR 24-inch drain on Dedham boulevard.  They have also been working on sewer inspection and rehabilitation, pre-drilling for ledge removal and tree trimming/removal along the pipeline route.  The Contractor had planned to have a second crew working on Walnut Street in January, but this has been pushed back to late February at the earliest.

erosion control

Erosion control installed

pre drilling

Pre-drilling for rock on Dedham Boulevard

RCP drain

24-inch RCP drain being installed on Dedham Blvd.

hoe ramming rock

Hoe ramming rock

tree removal

Tree removal on Dedham Blvd

tv inspection

TV inspection of existing sewers is ongoing

 

Sign up for electronic project notifications and updates through our Everbridge service.

Contact

For more information, please contact Jeff McLaughlin at (617) 305-5762.