MWRA online - home
Home
Water System
Sewer System
Harbor and Bay
School Program
About MWRA
Doing Business with MWRA
Contact MWRA


Boston Harbor and Massachusetts Bay
Massachusetts Water Resources Authority

Archive

CSO and SSO Reporting

Parts of metropolitan Boston has a combined sewer system, where surface runoff enters the sewer, reducing system capacity, particularly in extreme weather events with very heavy rains.  When stormwater and groundwater overwhelm the sewer system, a combined sewer overflow (CSO) or a sanitary sewer overflow (SSO) can result.

MWRA CSO NOTIFICATIONS MWRA SSO NOTIFICATIONS


MWRA has recently completed the final construction milestone of its Long Term Combined Sewer Overflow (CSO) Control Plan, a 25-year plan to reduce the impact of combined sewer overflows to surface waters in the metropolitan Boston area. The plan comprised 35 wastewater system improvement projects that bring CSO discharges at CSO outfalls in the Boston area into compliance with the Federal Clean Water Act.

Somerville Marginal CSO outfall

What is a CSO?

CSO Annual Discharge Estimates and Rainfall Analyses Reports (2014-present)

CSO Annual Progress Reports (2004-2015)

CSO receiving water quality monitoring in Boston Harbor



A Sanitary Sewer Overflow (SSO) is an unintentional discharge of wastewater to the environment prior to reaching a treatment facility. SSOs occur on infrequent occasions when the capacity of the sewer system is exceeded, usually due to extreme conditions such as heavy rainfall, or an obstruction or break in sewer lines. MWRA SSO Notifications.

Manhole cover

More about SSOs and how to help prevent them